Project #2871

Workshop on Condition Assessment Inspection Devices for Water Transmission Mains

$190,850
Completed
Principal Investigator
Kevin
Lillie
Research Manager
Jian Zhang, PE, Ph.D.
Contractor
Ondeo - NLTRC
Condition Assessment
Asset Management
Pipes

Abstract

Conducts a state-of-the-art literature review of non-interruptive condition assessment inspection devices for large diameter transmission mains (greater than 12 inches). Also conducts an expert workshop to review buried asset condition assessment research needs and performance of existing technologies. Considers the possible development of new technologies capable of in-service condition assessment of water transmission mains, as well as the relevant cost and performance guidelines. Published in 2004.