Project #1152

Integrated Methods for Wastewater Treatment Plant Upgrading and Optimization

$0
Completed
Principal Investigator
Movva
Reddy
Research Manager
Lauren Fillmore M.S.
Contractor
MPR Engineering Corporation, Inc.
Utility Management
Treatment

Abstract

This guidance document takes a systematic approach to integrated capacity assessment of a wastewater treatment plant and identifies factors that limit performance. It presents step-by-step “best-practices” for applying analytical methods and testing tools to optimize and upgrade wastewater treatment plants. Published by WERF. 314 pages. Online PDF. No Hardcopy, CD is available for $15 (2009)

Originally funded as WERF project 04-CTS-5.