Integrated Methods for Wastewater Treatment Plant Upgrading and Optimization

Completed
Principal Investigator
Movva Reddy
Project Manager
Lauren Fillmore
Contractor
MPR Engineering Corporation, Inc.
Treatment
Utility Management

Abstract

This guidance document takes a systematic approach to integrated capacity assessment of a wastewater treatment plant and identifies factors that limit performance. It presents step-by-step “best-practices” for applying analytical methods and testing tools to optimize and upgrade wastewater treatment plants. Published by WERF. 314 pages. Online PDF. No Hardcopy, CD is available for $15 (2009)

Originally funded as WERF project 04-CTS-5.